Quality Assurance

Piping Solutions prides itself in it’s commitment to Quality. Our QA systems are in accordance with AS/NZS ISO 9002. We have strived to continually improve our work quality and the supporting documentation.
Through this process we have successfully developed our own custom data basing system, offering a product that is far ahead of the field. This system has allowed us to have complete control through the process of manufacture, with tracking of all aspect of the job on a daily basis.
The database allows us to provide live reporting to our clients on the status of each spool in their project from beginning (date of drawing receipt), through the production process (Issue of drawings, Cutting, Fabrication including welded inches per spool and percentage complete), NDT, deliveries to painters and site. We also customize our system to accommodate our customers’ unique requirements. On client request these database reports can also be made available through our secure website, with an assigned username / password login

These systems have allowed us to provide our clients with a high level of transparency and the highest quality control throughout the management of their project, thus saving enormous costs and achieving the best product available.

Upon completion of a project, a comprehensive Manufactures Data Report is provided in paper and electronic form for each job containing such types of information where applicable:

  • Material Certificates
  • Weld coupon qualification reports

Piping Solutions takes pride in its commitment to Quality, we continually strive to improve our work quality and supporting documentation.
Through this process we have successfully developed our own customised “spool tracker data base system”, which is pivotal in producing products that are far ahead of the field in terms of traceability, tracking progress through the production phase and progress reporting.
The spool tracker allows us to provide live reporting to our clients via a secured web site (accessible 24 hours a day) on the status of each spool in their project commencing from receipt of materials & IFC drawings, workshop production, delivery to site & site installation.

These systems have allowed us to provide our clients with a high level of transpare ncy and confidence in Project delivery.